Re: INSUFFICIENT RAFT REINFORCEMENT IN 2 STOREY BUILDING If you solve the superstructure interactively, there is no problem, but are you sure about the bed coefficient? It was too much according to the general formula.
"@HRS0571":rki5pp4d" said:I MADE THE BASIC HEIGHT EVEN 80 CM IN THIS 2-STORY BUILDING, EVEN INSUFFICIENT REINFORCEMENT ERROR CONTINUES. IS NOT THAT MUCH REINFORCEMENT IN SUCH A BUILDING?You do not have permission to view link Log in or register now.[/url]IZ.ide10. In your project -Evaluate the "Superstructure interactive" solution option in the Analysis Settings / Foundation-Soil tab. -Evaluate the analysis results according to the "Enlarge the connection area" option in the Analysis Settings / Foundation Ground Tab. -When the General Report of the Earthquake Regulation is examined, "4" in the Analysis Settings / TDY Options tab. It seems that there is no need to mark the line "Apply /5R". When a solution is made according to the above-mentioned suggestions, the problem of insufficient reinforcement on the raft foundation is solved. The main reinforcements are working at minimum.
Where and when did this project get approval? What do you want to do? Ünver ÖZCAN"rcp52":1upblk38" said:Friends, I will need your comments, a project that I added a picture for came to me as approval. Can we accept it as a beamed slab, the program did not give any errors, it was solved with C30 concrete
Hello, -If the slabs are connected directly to the columns, it would be appropriate to choose the slab type as beamless slab.In this case, as stated in TBDY 2018 article 4.3.4.4, the earthquake forces must be met. There must be carrier system curtains that continue on all floors in both directions. -The choice of flooring type is under the control of the user in the TBDY 2018 wizard in the program. "Beamed or Cassette Slabs" may be selected by the user. -Additionally, TBDY 2018 7.11.5 in non-beam flooring systems, 7.11.6, 7.11.7, 7.11.8, 7.11.9, 7.11.10, 7.11.11, 7.11.12, 7.11.13 staple on non-beamed slabs and slab foundations clamping control and stapling equipment application are under user control. You can review the program's regulation compliance document."rcp52":2gmur2s8" said:Friends, I will need your comments, a project that I added a picture came to me as a confirmation. Bodrum+z+3 corner columns 30*35 project Dts2 basement curtain has 2 sides, room windows, all columns are almost unconnected to each other. Can we accept it as a beamed slab, the program did not give any errors, it was solved with C30 concrete
Hi, TBDY 30/100 rectangular curtains (P11-12-13) do not provide the 1/6 aspect ratio It must be entered as a column according to 2018. For the solution of the column beam joint shear safety problem, you can review the frequently asked questions document item 9."batuhann28522":330wpnga" said:Have a nice day.I couldn't solve the column-beam cutting safety problem on the balconies on the corners, I turned it into a curtain, but can you help with the solution as a column. Thank youYou do not have permission to view link Log in or register now.
Thanks for your interest. security problem solving options, but I was not successful, could you please take a look at the attached project"Levent Özpak":3n0z1etp" said:Hello, since 30/100 size rectangular curtains (P11-12-13) do not provide 1/6 aspect ratio, they must be entered as columns according to TBDY 2018. Solving the column beam connection shear safety problem For frequently asked questions document, you can review item 9.You do not have permission to view link Log in or register now.Good work
Could you upload the project file to a site such as"pelinagcan":w8us3u3x" said:I want to ask a question, there is an emergency, but the file is too big, the maximum allowed size is 4 MiB. This error is not accepted in the zip. I can