Hello, 4 -7 meters in hollow slabs etc. After the opening is passed, automatic transverse threading is possible in the program: Enter all your ribs as a cassette object that defines the transverse thread (There is no difference between the cassette and rib objects except for the notification possibilities.) Please see the information given in the link below:"telvin":1mf7an4p" said:We hope that the problem of automatic transverse teeth (two transverse teeth after exceeding 7 meters) will be resolved in the new version after 4 m gap in hollow slabs.
"excalibur_24":2kijydeg" said:- WHEN WE DON'T WANT TO DEFINE FLOOR SPACES ON THE MOLD PLAN, TO HAVE SAMPLE SPACE DETAIL AT THE END OF THE SHEET BECAUSE WE DEFINE THE FLOORING CAPACITY ON THE MOLD PLAN, BECAUSE WE DEFINE THE FLOOR INSUFFICIENCY if you are reporting the situation as a problem, send a sample project. Let's examine if there is a problem.Your request here is not understood. Could you add a sample project and elaborate? -WHEN WE ENLARGE BEAM DIMENSIONS by 1 CM OR MAKE OFF 1 CM IN COLUMN-BEAM JOINTS, B FAILURE CAN BE CORRECTED. It's confusing.. If you are talking about the mistakes about the lack of cross section, such mistakes are usually caused by the choice of the carrier system. Problem If you add a project you live in, we can examine if there is a problem with data entry.GIVES MANY ERRORS IN THE ELEVATOR CURTAINS
After receiving the report, you can display and print the index by clicking the "show index" icon."excalibur_24":1dntkd5n" said:-I WANTED TO HAVE AN INDEX AT THE HEAD OF THE REPORT.
Ladder detail is drawn as 1/1 on the drawing screen. I think your problem will be solved if the scale is 1/20 when printing out the drawing.I WANTED THE LADDER DETAIL TO BE AT 1/20 SCALE. IT MAKES OUTPUT ON A VERY LARGE PLAN WITH THE DETAIL OF THE LADDER. WE HAVE TO SHARE IT. WE CHANGE IT FROM THE SETTINGS BUT IT SHALL DRAW THE SAME WAY
"HakanŞahin":253x6t3k" said:instead, we could send a command to the slab toolbar and name it with the distribution beam and give the number. for example, if it averages once when it exceeds 4m, and if it averages 2 pieces when it exceeds 7m. Since the cassette openings are different, we remove the ribs and the cassettes separately. Also, we do not put reinforcements under the console ribs in the rib reinforcement details and we have to manually enter the 2Q10 manually."telvin":253x6t3k" said:We hope that the automatic transverse tooth (two transverse teeth after exceeding 7 meters) problem in hollow slabs will be resolved in the new version after 4 meters of clearance is passed.[/ quote] Hello, Automatic transverse threading is possible in the program after a gap of 4 -7 meters etc. is passed in hollow slabs: Enter all your ribs as cassette objects that define transverse threads. (There is no difference between cassette and rib objects except for the notification possibilities.) Check the information given in the following link:You do not have permission to view link Log in or register now.Good works ...
2- This is idestatic skin In your design, it means that there is a column with a margin equal to or lower than 1% in the basement, and a column with a margin of greater than 1% in the upper floor. As t, it shows that it is more difficult than the lower floor. If this column had more pursant than the lower floor, but still below 1%, both would have the same reinforcement. Here, ideStatik adds as many sprouts as the number of reinforcements missing from the upper column to the lower column, which I think is correct... Of course, it's up to you to manually intervene and equalize these reinforcements or increase the column dimensions... 7- A problem related to data entry and geometry control warning is given. I think there is no problem, I think it would not be appropriate for the program to intervene directly in the project. However, there may be an option to perform automatic geometry check before analysis. 9- This is a result of the nature of the semi-rigid diaphragm. It takes a long time to make a solution with so many shell elements in the system. As you say, can optimization be done, programmers will know..."ottomancagatay":2hh5rzn3" said:2-In some buildings (mostly with basement walls) it gives different reinforcements in columns and walls that continue upwards, I think this should be fixed 7-for example, SZ01 column's upper elevation is -61 cm and S01 on the upper floor When we forget to lower the elevation of the column, we analyze it, if we did not look at the geometric control, we can notice it when we get the details of the column, I mean, if the column whose upper elevation is lowered has a continuing column on the upper floor, it would be better to connect it automatically to the column on the lower floor. I made projects that took 25 minutes or even 63 minutes to analyze, which is pretty annoying, there is an option to cover flooring, foundation, etc. in order to analyze faster, but is there no possibility to reduce the analysis time that continues in semi-rigid?