ikarus_457
New Member
Top class civil engineering I am a student, my teachers asked me to model an existing building, with its reinforcements, my problem is that in the current project, the elevation of the foundation is -60 and there is a tie beam at its level 0. I did something by thinking myself, I constantly lowered the level of the foundation, then the columns remained in the air, the elevation of the columns was -60 I pulled it, they fit right, I made the tie beam with 0 elevation. The logic of making a tie beam in something I don't understand? Did they do it to raise the level? My request from you is can I build the foundation of the project in accordance with the project? Attached are the autocad static drawings of the building and the idecad file I entered myself.