TOP EARTH LOAD

cvlengineerr

New Member
There is soil on all 4 floors. HELLO FRIENDS, THERE IS SOIL FILLING ON THE 2.B FLOOR. I find 1.8 t\m3 *3.6 m =6.48 t\m2 and add this to the floor covering load. I make the slab thickness of 20 cm and analyze it, but somehow I cannot ensure the cutting safety of the column beam junction. Can you help me?
 
Back
Top