Hello there; The excel file you sent in the second link is not the geotechnical report, but the test results prepared by the soil laboratory. If you are going to prepare the static project: 1- You can enter 4.39/1.4 = 3 kN/m² (approximately) to the bearing capacity value in the program. 2- You can enter 1750 kN/m³ (approximately) to the Bed coefficient value in the program. Or, 3- You can request a GEOTECHNICAL report, which clearly states the qt and Ks values, prepared in accordance with TBDY2018, from the soil surveyors.