I WANTED TO DO ANALYSIS OF A PROJECT I WAS MANUFACTURING RISK ANALYSIS BEFORE AGAIN WITH THE NEW PROGRAM V:10 AS A TEST, IT GIVES THE FOLLOWING MESSAGE WHEN GOING TO ANALYSIS AND GOES TO RIC ANALYSIS. ANALYSIS OF THE SYSTEM MUST BE DONE PRIOR TO DETERMINING THE CONSTRUCTION PERFORMANCE.
				
			 
	 
  
  
                     German
 German  French
 French  Spanish
 Spanish  Portuguese
 Portuguese  Italian
 Italian  Arabic
 Arabic  Russian
 Russian  Japanese
 Japanese  Turkish
 Turkish