Good morning, first of all good work everyone. I encountered an error as a result of the building inspection inspection of a reinforced concrete project I prepared. I would like to get your opinion. I received a warning saying "Vertical threads are to be placed in hollow floors in places exceeding 4m". I interpreted it as perpendicular to the beam with the large span, but I'm not sure. I would be very happy if you are interested, good work.