oguzhanyetik
New Member
The building consists of b1+z+3 floors. Basement perimeter curtains exist in some places, if not in the entire system. The ground floor ZE safety of the building to be built in Amasya/Suluova region is 15 tons/m2 and the bed coefficient is 840. Although there are many carrier curtains in the system, I get very exaggerated results. In my curtain group, I often get reinforcements on the headboards. Since they will not make the relative floor offset in Annex4c, I cannot mark the tab, that is, the system checks according to 0.008. Your help would be greatly appreciated, I am so overwhelmed. Good work... 
				
			
	 You do not have permission to view link
		Log in or register now.
 
	 
  
  
                     German
 German  French
 French  Spanish
 Spanish  Portuguese
 Portuguese  Italian
 Italian  Arabic
 Arabic  Russian
 Russian  Japanese
 Japanese  Turkish
 Turkish