PERFORMANCE ANALYSIS REPORT

prjm

New Member
Hello, I'm doing a performance analysis, why does the Earthquake ground motion level show DD-3 instead of DD-2, as in the photo below, why does it show like this, can we do it as DD-2? how can we do that ?
 
"prjm":1e6rq37c" said:
Hi, I'm doing a performance analysis, in the report, as in the photo, why does the Earthquake ground motion level show DD-3 instead of DD-2, why does it show like this, can we do it as DD-2? How can we do it?[/ quote] Hi, DD-3 information is printed because it is required for Relative Floor Shift Control DD-2 Earthquake Ground motion level information is given at the top and in the TBDY 2018 Earthquake Parameters Report.
 
Back
Top