Hi, for BE1 Modal analysis case, when you increase the number of modes to 75, the mass participation rate in the Basement case is provided. I think you made a mistake in the unit of the bed coefficient in the analysis settings, check it from the floor report. The bed coefficient may be 1400 t/m3.