I made a project, there was no error in the report. While arranging the formwork plan (in my project consisting of 2nd basement, 1st basement, 1st floor and 1st floor), I noticed that the ribs on the floor of the living room before the balcony on the 1st basement floor are facing the short side. I turned it over and analyzed the long side and it gave 3-4 errors. I couldn't understand getting these errors from something so simple. Why is it so important? rigidity in the project. in good condition. Is there any problem if I take the report like this and map it as corrected? The project of a district does not push the municipality too much, but it still does not bother me to make it up late.
				
			 
	 
  
  