How can I connect columns S10 and S12 vertically?

erdigoksu

New Member
In the project, the reporter asked me to connect the s10 and s12 columns vertically and connect s05 with s07 and s06 with s08, but I cannot connect s10 and 12 due to low floor and hb, I would appreciate if you give an idea
 
Hello, you can connect the S10 column to s02 or s05 in the y direction. But it is not possible to connect it due to the low floor. Let me tell you, but with this column layout and low floor location, it does not seem possible to connect these columns in the y direction. In such cases, talk to the architect at the beginning of the project and take the necessary measures. you must receive.
 
Back