hello, in my project, flooring reinforcement continues in the elevator shaft in the formwork plan and the program adds additional reinforcement, how can I solve this? :roll:
Draw around the elevator shaft with the slab edge, then try laying the slab on the landing. It's hard to say anything without a project, but I think you should try this