For ribbed floors exceeding 4 meters in length, it is necessary to divide the floor with a vertical rib beam. We were able to do it in older versions. I couldn't find this command in recent versions. xxxx It automatically throws this partition beam on ribbed floors exceeding 4 and 7 meters. How do we divide the ribbed floor with a vertical beam in 7.022..