You do not have permission to view link
Log in or register now.
project file is in the link Good work a) Since the project I uploaded is hollow, it has been automatically mixed system has been chosen before. I didn't solve the mixed system project, frankly, I don't know what exactly has changed in the system, the only thing I know is that the joint cutting safety control is not done in the columns in mixed systems. b) For the first time in the new regulation and program, I am working on a building with a basement. I read that the project will be resolved in 2 phases in buildings with basements. In the information of Iden, first the basement will be calculated, and then the basement will be calculated separately, so frankly, I could not understand it at all, as we solved it in the past, I entered the system and analyzed the whole building. Is what I did right or wrong, how should we do the solution that is mentioned as a 2-step solution. c) Since the project is a strictly regulated and commercial zone, the entire parcel is used, so basically I have no chance of amputation. Even though I made the foundation thickness 75 cm, it still saves the foundation, I think I have no choice but to increase the foundation thickness. I also showed the elevator shaft on the project, is it a more accurate solution to solve the foundation and give the details of the elevator shaft in the forum? d) Do we need to add an extra load for hollow floor floors, excluding the moving load? e) In the new program, there was an increase in the analysis times, and I solved this project in a time like 7.5 minutes. Do you have a similar problem or is my computer extra slow? Apart from these, I am curious about your findings about the data entry of the project and the general solution of the project, I would appreciate it if you inform me. Good work.