I thought of carrying the closed exit in the system to the rib beams between the (AC) axis due to inconvenience of the architect, but I have hesitations, my experienced brothers, can you help me. I don't want to make a mistake like making beams attached to the column, I wanted to consult you, or I wanted to consult with you. Should I pull the closed protrusion between the axles back 20 cm to connect the beam properly?