Wallet acyclic

Olcayto111

New Member
I get an error for the lower and upper heads of the truss on the steel roof with 40 m opening, increasing the cross section is not a solution, I am waiting for your suggestions Sent from my Redmi 8A using Tapatalk
 
Hello there; Continue 1 full 1 empty along the structure with crosses on the roof for the top header. Pass the stability beam that continues throughout the structure at 10 meters in the sub-heading. Connect these beams to the truss sub-head with a cross-end joint. Make sure that these beams pass through the truss node points. The video on the link will help.
You do not have permission to view link Log in or register now.
 
Back
Top