aksualigurbuz
New Member
take it easy everyone. interactive solutions for superstructure in new projects. now in the regulation it is called superstructure interactive solution for C and D group floors. I wonder if I am doing it wrong. I would be very happy if you answer my questions... 1-what exactly is a superstructure interactive solution? means.. 2-Do we only do superstructure interactive solutions on C and D group floors? (as per the regulation) 3-Couldn't superstructure interactive solution be made on A and B group floors? 4- How is the foundation perceived (on A and B group soils) when we do not make an interactive solution for the superstructure? 6- When we do not make an interactive solution, the superstructure does the solution without taking its basic effects. 7- How will we create the foundation drawings if the superstructure does not take into account the foundation effects when we do not make the superstructure interactive on the A and B group soils. 8- Is the superstructure interactive solution done in cases like performance analysis (chapter 7)? 9-Why do we dig a foundation pit even though there is no such reference in the regulation. (I mean, if the foundation is known to be made interactively in the performance analysis, why the foundation type is determined)... Is there no need to dig a foundation pit especially in Group A and B soils? 9-The reason for opening the foundation pit will come later. Is it to be able to exhibit its basic condition in situations such as reinforcement curtains etc.? It's a bit long, but I'm sorry. I would be very grateful if you could reply. Good luck to everyone...