good work on the foundation, connect all the columns with the basement curtain. Give the basement level formwork and reinforcement plan. Show reinforced concrete on the fill at the basement level. In the earthquake code 16.8.5.2, tie beams can be constructed at the height from the bottom of the foundation to the bottom of the column in accordance with the foundation excavation. or reinforced concrete slabs may be used instead of 16.8.5.5 tie beams. In this case, the slab thickness shall not be less than 15 mm. The calculation of the slab and the reinforcement placed in it, given by equivalent 16.13, should be shown. What I'm wondering is, when the regulation says that it is enough to do one of these two items, the building control control elements should be done at the same time. thanks.