"fertugrul":2tnlq1t9" said:good day in a static project, I am getting this error in the column, I increased the column from 60 to 100, but the error did not go away, how can I solve it[/ quote] It would be better if you add your project.This information is very insufficient, but I recommend you to increase the: --Slab thickness for non-beamed slab, --Rat thickness for non-beamed raft, --or Concrete value.
Hello, -Basement floor is considered as rigid in the project, you should not accept this floor as rigid according to TBDY 2018 Article 3.3.1.1.Besides, the bearing coefficient and ground bearing strength appear as default values -For the solution of column beam joint shear safety problems, the frequently asked questions document, item 9."ardasepici":11fva4m4" said:raft tile does not provide stapling security. I could not fix the problem, I would appreciate it if you could help meYou do not have permission to view link Log in or register now.
The proposal project is attached Ünver ÖZCAN"ardasepici":2ihyhcj5" said:does not provide column stapling security