HakanŞahin
Administrator
In our new version, one of the most important drawing-related features is the reinforcement of slab gaps. For this purpose, gaps are drawn in real form with the Tile Spacing command. Then, if necessary, the gap reinforcement is changed by clicking the properties of the gap object. Unless otherwise defined, this reinforcement is automatically selected 2fi12 above and 2fi12 below. When the formwork plan is received in a project with a cavity definition, the reinforcements of all cavities are automatically displayed in the formwork plan. The sequence of operations is as follows: 1. Define tile. 2. Identify the gaps. 3. If necessary, change the gap reinforcement by double-clicking on the gap. 4. Perform slab analysis and get formwork plan.