Hello. In my project, I get the error "Increase the system rigidity with high relative floor drift". While doing the preliminary design for the geotechnical report, the geological engineer asked me to enter the soil class as ZE. Although I increased the concrete class and added new curtains to the system, I could not resolve the error in the X direction. Waiting for your solutions. Thanks in advance and good work.
You do not have permission to view link
Log in or register now.