Reinforced Concrete Project Control

erbilsancaktar

New Member
Dear friends/brothers, in my reinforced concrete project I have done, while the number of iron in the basement columns is low, it is high on the ground floor. and on normal lines, it drops to normal or close to normal. Although this is a 3-storey building, what is the reason for the high number of iron columns on the ground and normal floors? Where is my mistake? can you help me? It is said that there are those who can solve the same project or a similar project with less column irons. The program is the same program, the criteria we defined are the same, ground value, building class, earthquake zone etc. but still, the column iron comes out a lot. Can you help me please? Thank you
You do not have permission to view link Log in or register now.
HR.rar.html
 
-stiffness feature was off in the basement floor, first I opened it, I did not analyze before I opened it -then I did the analysis -the reinforcements do not differ much according to the floors - currently there are joint zone security problems in the columns - I used the command to delete the detail drawings and save it by compressing, if you do so, you can access the external file sharing site You don't need to install.
 
Back
Top