Hello friends, I have drawn the project and after analyzing, I am only getting the error of insufficient reinforcement on the raft basis. I increase the minimum rebar spacing, increase the rebar diameter a little more, but still can't solve the problem. What should I do with more design moment, I would be very happy if you could help me..
 
Hi My suggestions --1. My pipe is not rigid, remove the tick, --Remove the DS tick on the raft slab, --Raft tile was made 45 cm, --Q16-18 reinforcement was selected on the raft slab, When these are done, results can be obtained. The project is attached. Also -- Brace the ladder and solve it together, -- You can reduce the floor loads on the 2nd floor ceiling and remove the wall loads, -- Do not make the narrow side of the column less than 30 cm. Unver ÖZCAN
 
"unver":6en31jsu" said:
Hi My Suggestions --1. my pipe is not rigid, remove tick, --Untick DS in raft slab, --Rat tile made 45 cm, --Q16-18 reinforcement is selected in raft tile, These are The project is attached. Also -- Brace the ladder and solve it together, -- You can reduce the floor loads on the 2nd floor ceiling, you can remove the wall loads, -- Do not make the narrow side of the column 30 cm less. Ünver ÖZCAN
Thank you very much, Unver Bey For your support.
 
"ardasepici":2p08o39k" said:
https://we.tl/t-FpjyfHpdma the raft basically gives the error of insufficient reinforcement, I would appreciate it if you could help me
The reinforcement is insufficient in two areas in the raft, basically in Axle 2. Increasing the diameter of the reinforcement in these areas Provide Required Ace by reducing the interval. Existing Ace. Must be more than Required Ace. After editing, get the Basic application plan according to the new situation. Get a report. If you analyze again, you will select Max. Ø16 reinforcement in the Rebar selection dialog, and it will give insufficient reinforcement again.
 