New Member
good work. Attached is the file prepared according to the risky structures regulation. As a result of the on-site inspection, the reinforcements are 4 fi 14. In other words, there is a 6,16 cm 2 reinforcement area. Column dimensions are 20x35, ie 700 cm 2. Accordingly, the average reinforcement ratio is 0.0088. When we put this value in purchase, the structure is risky. It turns out to be risky. I wonder what could be the reason for this. Good work
 
Hello, This is a situation we detected in version 7. The column capacities calculated based on the reinforcement entered in the column reinforced concrete and the column capacity values calculated based on the price you entered manually are not the same. Since the capacity values are different, the impact/capacity ratios change. You can perform risky building analysis by entering reinforcement in column reinforced concrete. This has been corrected in version 8. Both purchase and reinforcement can be entered. Good work
 
Back
Top