Hello. my question is the prefabricated structures placed on the foundation. I only draw the foundation, while drawing, I add columns to the corners and make an average calculation of 80-100 kg m2 to the columns, divide it into columns and effect it as a point load. I just realized that when I analyze without adding load and after adding load In my analysis, the quantity does not change. Shouldn't the quantity increase according to the load I add? Why does the quantity do not change, is there something I missed? Also, is there a different solution suggestion? Instead of column and point load. Thanks for your attention I am attaching my project