m2 iron account

actombo

New Member
hello, can we see how much reinforcement and concrete went to ideCAD m2? Is there such an option? Good work
 
"actombo":24fy9bz3" said:
hello, can we see how much reinforcement and concrete went into ideCAD m2? Is there such an option? Good work
Currently, there is no such option in the quantity lists. It is among our notes as user requests.
 
Hello, you can get the iron-form-concrete quantity you want in detail in the reports-quantity section. If what you want is to understand the concrete-iron situation on the floor m2, you should divide these results by the total floor m2. However, this comparison may not give an accurate result when you compare the variables in different buildings, as it depends on the number of floors, foundation condition, live loads, earthquake condition, carrier system and so on. Unver ÖZCAN
 
"unver":adsvj7iu" said:
Hello, you can have the iron-form-concrete quantity you want done in detail in the reports-quantity section. If you want to understand the concrete-iron situation per m2 of the floor you want, you should divide these results by the total floor m2. However, this comparison is the building's size. It may not give an accurate result when you compare the variables in different buildings, since it depends on the number of floors, foundation condition, live loads, earthquake situation, carrier system, etc. Ünver ÖZCAN
HI, ÜNVER BEY, while I am calculating, I divide the total reinforcement by equivalent m2. is it the right approach?
 
Hello
"actombo":1m9rbd3s" said:
I divide the total reinforcement by equivalent m2 while calculating.Is this a correct approach?
What is the equivalent m2 you are expressing? Unver ÖZCAN
 
"unver":2pqa6qlv" said:
Hi
"actombo":2pqa6qlv" said:
I divide the total reinforcement by the equivalent m2 when calculating.Is this a correct approach?
What is the equivalent m2 you are describing? Ünver ÖZCAN
habitable area, architectural project m2.
 
Hello. It would be more meaningful if you divide the total floor m2 considering the conditions I explained above. Unver ÖZCAN
 
If the structural features are close to each other, the total reinforcement weight divided by the total m2 gives a value close to the truth.
 