Is there anyone who can solve the project according to the new version new regulation? Although I enlarged the columns and added curtains to the system, I could not solve it.
Thank you."asenyapitasarim":p5wrpisp" said:hello, I couldn't view your project because you used the top update from 10.09. Get the optional reports. Look at the red marked lines in the x and y directions depending on the lambda values in the relative floor offset, in which direction If it is ( x or y ) you need to add curtains in the red marked direction (you can see which direction is x or y in the perspective window) Best regards
Considering your warnings, I continued. As I couldn't get out, I started getting errors in the X direction. If I don't question its applicability in the field, I will actually use grout and get out of the business. I'm waiting for your new recommendations."unver":2qmjwev1" said:Hi My Suggestions: When the concrete is C30 and the solution is made --X direction relative story offset error, --Y direction is weak so it is suitable for both blocks add curtains to the places, there will be no floor drift error, -Then you will increase the dimensions of insufficient columns and curtains. -Make the raft foundation in one piece, -Remove the negative control on the raft foundation, see the link below for negative ground tension.You do not have permission to view link Log in or register now.Ünver ÖZCAN
Thank you for your reply. ((External corner columns continue 6 floors without beam connection. IT'S DEFINITELY INconvenient DON'T. HOW IS THE BUILDING PASSING FROM THE AUDIT AND THE MUNICIPALITY? )) Do you mean connect from column to girth here? direction framed Y direction framed pe You have to choose the rdel, )) where exactly do we choose this place?"unver":16qeod5o" said:Hi My Suggestions: --External corner columns continue 6 floors without beam connection. TOUGHLY DON'T MAKE IT A CONDITIONAL SITUATION. HOW DOES THE BUILD PASS THROUGH THE AUDIT AND THE MUNICIPALITY? /color] --Connect the columns to each other with beams outside the building, (create a frame,) --You should choose the load-bearing system coefficients with X-direction framed Y-direction framed curtains, --1. In the basement floor, S03 column is not attached to a place, - -You can remove the wall loads and reduce the floor loads on the ceiling of the 5th floor. Ünver ÖZCAN
Hello, the values entered in DD-3 in the TBDY Wizard/Design Spectrum tab are incorrect. The coefficients given for the DD-3 earthquake ground motion level must be entered from the Earthquake Map. If the latitude and longitude coordinates are correct When you click on the "Offline" line, you can also use the values calculated by the program (There may be slight differences between the values taken from the map because the algorithms are different.) Good work."batuhann28522":3w2oqebg" said:Good afternoon, even though the project is small, I get the error "Increase the rigidity on the 2nd floor, can you help me?You do not have permission to view link Log in or register now.üner.rar.html