ideCAD 6.01 BETA2 Update.. Try it, give feedback...

Status
Not open for further replies.

HakanŞahin

Administrator
ideCAD Static 6.01 program is available as a BETA 2 test version for your trials and comments. You can send your findings and suggestions regarding the program to [email protected] or you can write them under this topic in the forum. We would like to thank all our users who reviewed the previous beta version and shared their opinions with us. You can download the full cd content of the program from the link below. List of works done in the program: 1. The problem of breaking when clicking the pile command no longer occurs (from the forum) 2. The problem of fi symbol encountered when importing to Autocad has been fixed. (forum to mhanifata, sardurmuş, msa78 etc.) 3. Adjustments were made regarding the status and selectability of the blocks and sub-blocks in the drawings. (clever from forum78) 4. When drawings are blocked, their layers become standard. Now blocks are made so that each element remains on its own layer. (from the forum, saridurmus) 5. In the vertical opening, only the stirrups of the tightening zone were drawn on the upper floors. It is now drawn according to the lengths that should be in the fold. (oznb in the forum) 6. In automatic naming, pitch indices can now be given separately. (Tawakkul from the forum) 7. The index entered in the floor parameters is no longer deleted. (intelligent from the forum78) 8. The situation regarding stirrup hook lengths has been fixed. (mhanifiata from the forum) 9. In Stirrup pose, "-1" is no longer written (mhanifiata from the forum) 10. The dome elevation was not taken into account in the 3D frame on the upper floor. It is now taken into account. (from the forum gköse) 11. In a project read from the old version, the K114 beam did not appear to be attached to the column. It's been fixed. (tawakkul from the forum) 12. 10 digit characters can now be entered in the parcel line in optional reports. (dester) In the 13th column application plan, if a scan is selected, it can now be canceled (Y. Özhan) In the 14th template plan, all reinforcements can now be selected with one click.(Kevser Ekincek) 15. An invalid input message has been fixed when exporting Dwg. 16. Build components report is now received on 64-bit operating systems. 17. The situation where the outer perimeter line is drawn on the column reinforcements in some conditions in the basement perimeter bulkheads has been resolved. 18. In the column application plan, the status of the columns that are intended to be opened in place but that do not fit due to their scale are now given as a warning. 19. In the curtain details, the cases where the outer contour of the curtain cuts the columns have been fixed. 20. Fixed the issues where the placement of stirrups in column detail blocks sometimes overlapped. 21. In the column application plan, the case of drawing the dimension line given in the details of angled columns at an incorrect angle has been resolved. 22. Fixed cases where Stirrup detail overlaps the top of the column. 23. Some errors detected in the column application plan in a project were fixed (- Stirrup was not drawn in the S134 column, it was drawn. There was no reinforcement on the 75cm side in S15, it is there now. There was an empty column reinforcement detail box, it was fixed.) 24. Detected in a project Wrong curtain details are now drawn properly 25. In case of displaying curtain details schematically, texts such as 2fi12/0 are now written correctly. 26. Conflicting stirrups and crossties details have been resolved. 27. A project that failed during the transfer of the project to the Sap2000 program no longer gives an error. 28. The display of loft nki values was incorrect in B2 control in a project. Fixed. Nki values are now printed as absolute values. 29. The critical shear height construction now starts from the top of the rigid basement. 30. A situation related to the termination of the program that occurs when saving as an old version has been fixed. (S. Yıldırım) 31. The program was terminated with the Save button in the building components dialog. It's been fixed. 32. Autocad was not opening a dwg imported from the project. The problem's been solved. 33. In the curtain details, the reinforcement belonging to the header area is now shown as 2*13fi14 for example. Previously, two were written separately. 34. The problem of program termination during the analysis of a project has been fixed. 35. Incorrect drawings in the opening of curtains that are less than the floor height, such as basement curtains, have been fixed. 36. In the case of a curtain-sized column in the system, the program was terminated when a report was received and the report was exited. Fixed 37. When saving the project as an old version and opening it in version 6.0055, column properties were not entered. It's been fixed. 38. Speed optimization of a structure that takes a long time to analyze with the superstructure-base interaction. 39. Pile foundation command has been added to the program's "draw" menu. 40. In a project, there was a problem in the vertical opening of the ground floor s26 column in the middle region stirrups. Fixed. 41. In one project, the first floor beams K44, K47 were extending through the columns. Fixed. 42. Although sufficient stirrup reinforcement diameter was selected in a project, a cut safety warning was given on the curtain. Fixed. 43. In one project, the K36-K37 beams could not be attached to the P15 panel. It's connecting now. 44. Mixing status of texts in column application detail expansions has been corrected. 45. Mixing of texts in the cross section in beam expansion has been corrected. 46. The situation where the program terminates while drawing a door-window has been fixed. 47. The automatic scan command is now active by default in the scan toolbar. 48. The "find scan gap" icon in the scan toolbar is no longer selectable. 49. In a project with a raft height of 60 cm, the analysis took too long. Speed optimized. 50. If "model as shell" is selected in the curtain settings, it is no longer allowed to interfere with the defined section parameters of the curtain. 51. In slab loads, the last user defined value did not appear again. It appears now. (Ş.şahin) 52. Corrections were made regarding the selection of extra pile reinforcement in the threads of ribbed and cassette floors. (M. Ayhan) 53. The arrows of the figure showing the linear slab load on the plan are now drawn and the faces are written in the direction of the linear slab load. (Ş.Şahin) 54. The locations of pile foundations are now shown in the foundation application plan. (Y. Bağder) 55. The index is now N in cassette expansions. (E. Korucuoğlu) 56. The visible difference between column compaction zone and column vertical expansion in continuous foundation drawing has been removed. (Ş.Şahin) 57. In a project, the situation regarding the excess moment of the beams connected to the wall from the short direction was regulated. (S. Bektaş) 58. Optimization of reinforcement selection was made in rib and cassette selection. 59. In the rib and cassette reinforced concrete dialog, the right support reinforcement area is no longer written incorrectly. 60. In systems with circular columns, the number of rigid arms created in the raft and flooring is now more convenient than the system. 61. In the curtain details, the texts in the circle are now moved with the fast move command. 62. Adjustments were made regarding the scales of the tables on the edges of the sheet. 63. Adjustments were made to the pool general settings dialog. 64. The situation where the program terminates when the column is importing the application plan has been fixed. 65. Modal deformation animation is now done in + / - directions in accordance with the sap2000 program. 66. Internal dimensioning is now given as a block in the mold plan. 67. Get the symmetry of the ladder, change the parameters. The ladder was formed incorrectly. Fixed. 68. In a project, a column sprout was drawn with zero reinforcement in the foundation expansions. It is no longer drawn. 69. Fixed the L-length error of the ampatment reinforcement in the continuous base meter. 70. Reinforcement amount written in column sprouts in continuous foundation drawings is now given as a total. 71. Reinforcement table is now also generated for tie beams. 72. The comma error in the amount of reinforcement in the single base report has been fixed. 73. In the die plan, the cantilever bar was defined in the wrong type in the bending table. Fixed. 74. The cases where the L curtain contour was drawn incorrectly in the column application were fixed. 75. Fixed incorrect curtain detail when similar curtains are grouped between floors. 76. In the slab parameters, the hook of the additional reinforcement is now drawn to point downwards. 77. In the column application, the position of the measurement line of some columns could be shifted. They are now drawn where they should be. 78. In the mold plan, the separator diameter of the axle dimension line has been brought to a size suitable for the output layout. (ş.şahin) 79. The case of fractional measurement values between column and die axles has been fixed. 80. In the column application plan, information about the axles is now written if desired. 81. In the vertical expansion of the column, when the distance between the two reinforcements is small, the longitudinal reinforcements were intertwined. The program now performs a lower bound check. 82. Fixed some erroneous cases related to compaction zone lengths in column vertical expansion. 83. Fixed the cut-out reinforcement drawings that occurred under certain conditions in the shear detail. 84. Fixed a case where columns grouped with open outside option do not work correctly in the column application plan. 85. Fixed a case where the panel length was displayed incorrectly in the formwork plan 86. There is no problem anymore when drawing a space inside the land space 87. The possibility to select the entire land in one go has been made. 88. General elevation can be given to the land. 89. Clicking the edge of the land selects the land. 90. Added size and unit selection to terrain settings. 91. Fixed a bug that occurred when closing the polygon while drawing the terrain of the polygon. 92. Fixed some bugs in the field. 93. Terrain command was taken from the Objects section and added to the Dome vault in the Draw menu. 94. A problem in the land excavation calculation has been fixed. 95. Facilitation for changing the level of the land was made. For example, when you double-click on one of the elevation measurements of a space consisting of 10 points, the clicked point appears as selected in the land gap settings. BETA 1 List of works done in the program: 1. New column application plan drawings 2. New column vertical expansions 3. New wall vertical expansions 4. Pile raft foundations 5. 3-dimensional terrain using contour curves and free elevation points within the architectural and static program modeling 6. Well foundations 7. Displaying all reinforcements in the vertical expansion of the column 8. Displaying the basement perimeter walls in the column application 9. Continuous foundation superstructure interactive solution 10. Multi-stage excavation quantity calculation including filling calculation 11. Drawing torn reinforcements on the panels 12. U Calculation and drawing of equipping polygonal walls such as , T, L as a single wall 13. Detailing and drawing the walls together with columns 14. Drawing the basement perimeter walls as a single wall 15. Double stirrup option in columns 16. Optimizing the number of polygonal column reinforcement 17. Stirrups in circular columns automatic drawing 18. Column expansion and column beam connection details are drawn together. 19. Arranging type columns at once in column vertical expansion 20. Column capacity diagrams 21. Total collapse checks for well foundation and retaining wall 22. Letterheads in column drawings 23. Drawing curtain rods in curtain openings 24. Column rod lengths with 1.5lb or 75fi options 25. Consideration of assemblies in similar floor beam expansions 26. Cross-ties openings in column and wall details 27. Possibility to interfere with the scales of columns 28. To be able to take into account the cohesion effect on the retaining wall 29. To define plains, areas and pits in the field 30. The elevation at any point of the land being able to query 31. Addition option in the form of pillars on floors 32. Editing the information about the project and the company logo with the project settings dialog 33. Getting a column application plan on all floors with a single button 34. Changing the font of the reinforcement in the openings 35. Show/hide the joint point command 36. Structure in tree/elements/right Show click/point forces command 37. Ability to open again from the opening screens without returning to the floor plans 38. Making the building tree open and closing automatically and using it with all views 39. Accessing the drawings more easily with the drawings folder under the building tree 40. Calling the reinforced concrete dialogs from the opening screens 41. Multi-core support at various stages of the program 42. A2- A3 control and report 43. In the calculation of the stirrup length of the beams, the existing reinforcement diameters from the neighboring supports in the upper region can also be taken into account
 
Looking at the list, the benefit of feedback is clear. By opening this forum, hundreds of BETA Testers have been involved in the project. I wish success to the ideCAD team. Both for creating a very useful program and for giving importance to user feedback... Lastly, I would like to thank the users who detected and reported problems without being lazy, thanks to you, we have a program that is constantly improving and whose mistakes are compensated. The DEMO version helped me a lot when I was preparing my graduation thesis when I was a student. ideCAD and SAP2000 were a great pair ;)
 
I would like to thank the ide Yap family for their successful work. but there are still some deficiencies, for example ... why doesn't the intermediate rib be thrown when the rib length exceeds 4 meters? A cross section can be drawn over the formwork plan drawings and the section name and section elevation can be given. Many things that I mentioned before, like this, have not been added despite such improvements. I think it must be very difficult to introduce everything to the program.
 
Greetings, nice improvements have been made. I immediately entered the project in 6.010 beta2 with two dilatations, which I tried to do in 6.010beta1, and I took the drawings without making any corrections behind the analysis and thought I would add them in raw form. The changes made in the scan are not used in 6.010 beta2, which is now available. I will write as I look at it from the other side. It's nice and gratifying that updates are delivered quickly. Many thanks to the friends working in the arge. good work.
 
"39. Pile foundation drawing added to program menus." I couldn't see any information about pile foundation drawing in beta 2 drawing menu.
 
Hello, I think there was a misunderstanding. I changed that wording in the list. 39. Pile foundation command has been added to the program's "draw" menu. I'm attaching a screenshot to the message:
 
Congratulations for your beta2 work. Every subject is getting better step by step. Thank you for myself. I see that there is a notation difference between the old version and the new version regarding fi notation. The display of the ST420 in the new version is similar to the display of the ST220 in the old version. I think the old notation was more distinctive. I prefer to use the old one.
 
Hello there. Congratulations for your work. My question is: I want to use a line as a dimensioning delimiter. I set this in the column application, but I do not have a chance to adjust the pattern detail and crease expansions. The dimensioning mark comes out round. For this problem, for the details of the beam foundation and formwork, as in the column application, is it possible to put a scaler separator, a grid or a round option? Thanks
 
1-) It is nice to add the draw pile foundation command. I wonder if pile foundation drawings will be added in the next version or will it be content with just calculations like pool and dome? 2-) The program gives an error when I define pile foundation and analyze it. When I delete the piles and make an analysis, the program does not give an error... 3-) Is it planned to make an addition to the program by printing the section name, automatic sectioning and elevation on the section plans? 4-) Is there a study on the division of ribs exceeding 4 m with intermediate ribs by the program according to the regulations? 5-) If there is any progress on the pool drawings, how long will we wait? 6-) When will 6.10 get rid of the beta :))) I would like to thank the ide building family for the beauties they have done for us, I wish their success to continue and I hope their use like xsteel and sap2000 will become widespread :)
 
When Beta version users and ideYAPI say that the program is ready to use, 6.01 Beta will be removed. ideYAPI does not make any commitments or deadlines for new opportunities to be added to the program. Please continue to forward your requests to ideYAPI. Please attach your project with a pile foundation error.
 
I wish you success in your studies and I encountered a couple of problems, let me let you know. 1- After performing a linear performance analysis and recording, the acceleration spectrum multiplier is changed and when you perform the second analysis, the acceleration spectrum multiplier changes in the first analysis. While the analysis settings change made in the 1st project, it also changes in the other project. ground safety When you try to open a project made in version 3-5 and the dominant ground period
 
Hello,
"cihat25":3kn73ok1" said:
1- When you perform the 2nd analysis by changing the acceleration spectrum multiplier after recording and recording the linear performance, the acceleration spectrum multiplier changes in the first analysis, the same acceleration spectrum multiplier value appears in the 2 analysis results,
-This situation has been added to our detection list.
2- While 2 different projects are registered on the desktop, the change in analysis settings made in 1 also changes in the other project. soil safety tension and prevailing soil period
The problem with changing the project settings has not been encountered so far The reason why your settings have changed may be that the "Apply Active Pen and Color" line in the Load project dialog is checked. If this line is checked and the project is opened, the previous project settings will also be applied to the new project that has been opened. If this is not the case, can you provide some more detailed information?
3 - When you try to open a project made in version 5, it throws it from the program
Your unopened project Can you add me to the forum? If it is a big project and you cannot add it to the forum, you can also send it to [email protected]. I wish you good work
 
hello, under the auto name objects option, up - down for horizontal direction, left - right for vertical direction is written in axis naming. it's not that important though. but I wanted to correct an illogicality. Also, it would be great if you give up ifc 1.5 and support ifc 2x3 in the final version. because we cannot export the project for control or detailing purposes. It goes without saying that most current programs support ifc 2. Thank you in advance, I wish you good work.
 
Is there any native program other than ide that supports ifc? I did not hear . I didn't see it either. I'm writing icf static, I'm looking for google, only ide is coming.
You do not have permission to view link Log in or register now.
 
When the live load is entered on the beam, the user defined load appears as tf/m2. Other loads are seen as 0.75 tf/m, like the tribune load. But I don't understand if it multiplies them all by the beam width in the calculation. It reduces it at a rate of one in 4 and again enters in tf / m2. It is necessary to enter in tf / m like the wall load and see the same value in the calculations. When I enter 1 tf/m on my beam, it detects 1 tf/m2 . It shows 0.25 tf/m2 in the calculations. I also added the picture. When I use ready-made loads, there is a change in the ratio of 1 in 4 and it becomes tf/m2. live load view in report?
 
Greetings, the live load entered on the beam is entered as tf/m2 under the "STATIC REINFORCED CONCRETE" tab in the "BEAM SETTINGS" menu. it is converted to tf/m in the report. so the beam is multiplied by bw. however, the unit text will be tf/m, while tf/m2 is written there. I think there is just a typo.
 
Hello, The value entered and printed in the dialog is correct... Only the t/m2 text in the report will be corrected as t/m in the next update.
 