sonsamuray
New Member
Hello Continuous The program closes while EXPORTing the foundation drawings.
You do not have permission to view link
Log in or register now.
Thank you. Is there a way to connect raft and constant foundations? Or is it necessary in this system?"Levent Özpak":355ru0k3" said:Hello, Bodrum perimeter curtains are entered by dividing. Enter data so that the basic joint points are connected from the joint points of the curtains as in the attached project. Note: One end corresponds to the curtain and the other end to the raft (TK149-150,151 ,...) continuous foundations work as a console, for your information... Good work