I can't get Permanent Foundation Drawings

Hello, Bodrum was entered by dividing the perimeter curtains. As in the attached project, enter data in such a way that the main nodes are connected from the nodes of the curtains. Note: Continuous foundations with one end to the curtain and the other to the raft (TK149-150,151,...) work as a console, for your information... Good work.
 
"Levent Özpak":355ru0k3" said:
Hello, Bodrum perimeter curtains are entered by dividing. Enter data so that the basic joint points are connected from the joint points of the curtains as in the attached project. Note: One end corresponds to the curtain and the other end to the raft (TK149-150,151 ,...) continuous foundations work as a console, for your information... Good work
Thank you. Is there a way to connect raft and constant foundations? Or is it necessary in this system?
 