I have a project with hollow floor tiles. I have 60 by 32 beams. the building control told me to fix the b errors, but I fix the errors on one floor, different errors appear on the other floor, I can't fix it. When you move it too much, this time the beam gives an error. It took a lot of work, it got on my nerves now... Does anyone have a suggestion on what to do?
				
			 
	 
  
  
                     German
 German  French
 French  Spanish
 Spanish  Portuguese
 Portuguese  Italian
 Italian  Arabic
 Arabic  Russian
 Russian  Japanese
 Japanese  Turkish
 Turkish