The value of 450kg/m² that you specify as the coating load is the concrete, sheet metal, reinforcement, etc. that make up the composite floor covering, excluding the steel beams. the elements contain their own dead load, right? If so, taking into account the last information you provided; Roughly HEB600 (S275) for columns, HEB1000 (S275) for main beams, and IPE240 (S275) profile for composite secondary beams to be placed at 2 meters intervals, if average stud, slab sheet (able to carry loads at pre-composite stage at 2 meters span) and concrete properties are selected, then IPE240 (S275) profile is sufficient. . In this case, the ap/g value is approximately 0.57%, which is quite sufficient for this type of structure. While you were modeling the beams in the structure, could the default wall loads be left on them? Maybe that's why they don't seem like enough. Also, taking the value of 1.5 as the building importance coefficient was open to evaluation. Respects.