Hi, While the foundation excavation of the building at the lower level is being excavated, the dilatation side must be shored. Otherwise, it is not safe for such a high building to sit on it by excavating the slope and then backfilling. Also, take the surcharge load of the building on the upper level to the dilatation side curtains of the building on the lower level and I recommend you to create buttresses by making curtains perpendicular to those curtains.
Will the surcharge load be affected when shoring is done? - such a structure has to be shoring or ? - If there is a dilatation in between, you need to open a project file and model it one by one, after which 2 different structures are required. It doesn't take 77 minutes. - My request from the managers is to add their own experiences to the information we share. correcting our wrong information. For example, it is necessary to model 2 buildings separately, right? - I ask the friend who opened the subject, I wonder how this structure was made, it has been about 1 year since the subject was opened