Friends, I need your information on two issues in our project. Thanks in advance.
You do not have permission to view link
Log in or register now.
My suggestions; --1 remove the stiffness check in the basement, --Leave at least a joint gap between the two blocks according to TBDY2018 item 4.9.3.2, --A on the ground floor -Beams can be placed on E1 axes, -Finish the calculation by making the finite elements 0.25 m. Ünver ÖZCAN"ahmetkcck":3hk0u87m" said:Can you check
thank you I tried everything but I could not solve the raft basic reinforcement problem and the stapling error"unver":3idzsv26" said:HiMy suggestions; --one. Remove the stiffness check in the basement, --Leave at least a joint gap between the two blocks according to TBDY2018 article 4.9.3.2, --Beams can be placed on A-E1 axes on the ground floor, --Finish the calculation by making the finite elements 0.25 m. Ünver ÖZCAN"ahmetkcck":3idzsv26" said:can you have a look
--With the Combine command, nearby accessories can be combined, --The spacing of additional reinforcements can be slightly reduced,"ahmetkcck":3hf3gmo4" said:radiye basic reinforcement issue
The link below will help you. The mat board stapling security is not provided."ahmetkcck":3hf3gmo4" said:stapling error I couldn't fix