Continuous foundation beams

Gulsah

New Member
good day, I am building a 2-storey building and I can't see the anchors of some of the foundation beams in the openings. (I am sending the project as well) I need an urgent response, thank you in advance..
 
There is an error in your data entry. While entering the foundation under the curtains, you should draw a continuous foundation beam that continues along the length of the curtain, passing through the starting and ending point of the curtain. So you must have a continuous foundation with an opening equal to the curtain length. From this perspective, your basic data entry needs to be corrected. The appendix contains new continuous foundations as amended. Here, only the subject you mentioned has been examined and other issues such as tension etc. have been ignored.
 
Mr. Gulsah - there is no problem if you define the base taking into account both ends of the curtains. -You have no flooring on the second floor. Give the beams there as beams with a level difference like the first floor beam, remove the second floor. Take it easy Unver ÖZCAN
 
"unver":qj7dra5p" said:
Mr. Gulsah -if you define the foundation by considering both ends of the curtains, there will be no problem. -you don't have a floor on the second floor. Give the beams there as beams with a level difference, like the beam of the first floor, remove the second floor. EASY Unver ÖZCAN
First of all, thank you. Since there is no flooring on the 2nd floor, the program says to create a rigid diaphragm and solve it or the structure without a diaphragm. ??
 