CONSTRUCTION OF ADDITIONAL FLOOR TO THE EXISTING BUILDING PERFORMANCE ANALYSIS

engcivil

New Member
Hello there; It is desired to go up one more floor to a building that was built as Z+1 in 2006. Coring was taken from the building. In this case, how should I go about the performance analysis of the existing building and the analysis after adding the floor. Thanks in advance...
 
Back
Top