Hello; In the attached project, in the post-analysis controls of the building whose basement floors and all normal floors are separated, calculations are made together in the control of TBDY 2018 article 4.3.2.4.b, although there is no beam connection between the curtains in the horizontal direction. Is it possible for you to have a look, please?