about the renovation project

mhmt_ali

New Member
I want to add a floor to a project drawn in 2010. Accordingly, when I enter the beam reinforcements of the previous project, it gives an As reinforcement error as seen in the picture. I wonder if there is no solution for this project other than reinforcement.
 
"mhmt_ali":2bxys34v" said:
I want to add floors to a project drawn in 2010. Accordingly, when I enter the beam reinforcements of the previous project, it gives an As reinforcement error as seen in the picture. I wonder if there is no solution for this project other than reinforcement.
Hello In the analysis, the current state of the building can be examined with the linear performance analysis method in cases such as strengthening or adding floors. The errors you see in the reinforced concrete dialog are not important. When you perform a linear performance analysis, the performance levels will be determined for the existing building or 4 earthquake loading with the existing building + additional floors. These levels are the first of the report. (Immediate use, Life safety, Pre-collapse, Collapse status) Examine the earthquake regulation Chapter 7. If the building is a residential building, the life safety level is sufficient for the design earthquake. Good work.
 
Back
Top