What precautions should I take because of the structure?

Hello My suggestions; I fixed your project. The following is up to you, -- If there is a wall on the rib slabs, increase the live load, -- Solve the ladder together with the building, -- Add some small slabs while correcting the curtains. Unver ÖZCAN
 
Thank you very much for your comments. I want to ask a few questions. *Why did you not find the continuous foundation system suitable? *I defined linear loads on the ribbed slab. Are these not enough? *should i add carrier curtain to the system?
 
Hello
"aykuthanbudak":lvj8pix7" said:
*why didn't you find the continuous foundation system suitable
-- Two of the continuous foundations were having soil problems,
"aykuthanbudak":lvj8pix7" said:
*I defined linear loads on ribbed flooring . Are these not enough?
-- You cannot define a linear load on the rib in version 7,
"aykuthanbudak":lvj8pix7" said:
*should I add carrier curtain to the system
--Add it if you want, but there is no problem in this case either.
 
"aykuthanbudak":1iwmbjfy" said:
*why didn't you find the continuous foundation system suitable
"unver":1iwmbjfy" said:
- Two of the continuous foundations had ground problems
Hello, Additionally in version 7 In the rafter raft foundation system, no superstructure interactive solution is envisaged. If the floor group is C or D, since Tdy 2007 requires a superstructure interactive solution, it would be appropriate to design the foundation system as a beamless raft in terms of program and regulation compatibility.
"unver":1iwmbjfy" said:
In version 7, you cannot define linear load on ribs.
In case of semi-rigid solution, linear slab loads defined on ribbed slab are taken into account in version 7. Good work
 