engineer_yildiz
New Member
QUESTION-A: IN A BUILDING WITH AN EXTRACTION, ONE EDGE OF THE OUTPUT IS CONNECTED TO THE COLUMN (S101), THE CONSOLE IS A BEAM (K101A), AND THE OTHER SIDE IS A STUD BEAM (K101B) PLUGED INTO THE BEAM (K100). THINK THERE IS NO FLOOR BETWEEN THESE TWO CONSOLE BEAMS: 1- FOR S101: SHOULD THE PICTURES BE MARKED THIS COLUMN BROWS THE CONCRETE FLOOR ON THE STATIC/ REINFORCED CONCRETE TAB? 2- FOR K100: SHOULD BE MARKED THIS BEAM HAS CONCRETE FLOOR IN THE STATIC/ REINFORCED CONCRETE TAB? QUESTION-B: IN A BUILDING WITH AN EXTRACTION, ONE EDGE OF THE EXTENSION IS CONNECTED TO THE COLUMN (S101) AND THE CONSOLE IS A BEAM (K101A) AND THE OTHER SIDE IS A STUD BEAM (K101B) ATTACHED TO THE BEAM (K100). SUPPORT THAT THERE IS FLOORING BETWEEN THESE TWO CONSOLE BEAMS: 1- FOR S101: SHOULD THE PICTURES BE MARKED THIS COLUMN BROWS THE CONCRETE FLOOR ON THE STATIC/ REINFORCED CONCRETE TAB? 2- FOR K100: SHOULD BE MARKED THIS BEAM HAS CONCRETE FLOOR IN THE STATIC/ REINFORCED CONCRETE TAB? QUESTION-C: IF THE CONSOLE BEAM IS NOT EFFECTIVE IN MARKING THIS PICTURING AND ONLY THE CONSOLE FLOORING IS EFFECTIVE: IN A BUILDING WITH AN EXTRACTION, ONE EDGE OF THE EXTRACTION IS CONNECTED TO THE COLUMN (S101) IS A CONSOLE BEAM (K101A BEAM) LET THE BEAM BE (K101B). SUGGEST THAT THERE IS A RIBBON (THREADED) FLOORING BETWEEN THESE TWO CONSOLE BEAMS PARALLEL TO THE CONSOLE BEAM: 1- FOR S101: COLUMN STATIC/ REINFORCED CONCRETE TAB THE COLUMN CONSTRUCTION CONSTRUCTION CONSOLE CONSTRUCTION CONSTRUCTION? 2- FOR K100: SHOULD BE MARKED THIS BEAM HAS CONCRETE FLOOR IN THE STATIC/ REINFORCED CONCRETE TAB? QUESTION-D: IF THE CONSOLE BEAM IS NOT EFFECTIVE FOR MARKING THIS Phrase AND ONLY THE CONSOLE FLOORING IS EFFECTIVE: IN A BUILDING WITH AN EXTRACTION, ONE EDGE OF THE STRAP IS CONNECTED TO THE COLUMN (S101) IS A CONSOLE HANDLE (K101A HANDLE HANDLE) LET THE BEAM BE (K101B). SUGGEST THAT THERE IS RIB (THREADED) FLOORING BETWEEN THESE TWO CONSOLE BEAMS IN THE DIRECTION TO THE CONSOLE BEAM: 1- FOR S101: COLUMN STATIC/ REINFORCED CONCRETE TAB THE COLUMN CONSTRUCTION CONSTRUCTION THE COLUMN CONSTRUCTION CONSTRUCTION? 2- FOR K100: SHOULD BE MARKED THIS BEAM HAS CONCRETE FLOOR IN THE STATIC/ REINFORCED CONCRETE TAB? QUESTION-E: IF THE CONSOLE BEAM IS NOT EFFECTIVE FOR MARKING THIS Phrase, AND ONLY THE CONSOLE FLOORING IS EFFECTIVE: IN A BUILDING WITH AN EXTRACTION, ONE EDGE OF THE EXTRACTION IS CONNECTED TO THE COLUMN (S101) IS A CONSOLE BEAM (K101A HANDLE BAR) LET THE BEAM BE (K101B). SUGGEST THAT THERE IS RIB (THREADED) FLOORING BETWEEN THESE TWO CONSOLE BEAMS IN THE DIRECTION TO THE CONSOLE BEAM: 1- FOR S101: COLUMN STATIC/ REINFORCED CONCRETE TAB THE COLUMN CONSTRUCTION CONSTRUCTION THE COLUMN CONSTRUCTION CONSTRUCTION? 2- FOR K100: SHOULD BE MARKED THIS BEAM HAS CONCRETE FLOOR IN THE STATIC/ REINFORCED CONCRETE TAB? QUESTION-F: IF THE CONSOLE BEAM IS NOT EFFECTIVE IN MARKING THIS PICTURING AND ONLY THE CONSOLE FLOORING IS EFFECTIVE: IN A BUILDING WITH AN EXTRACTION, ONE EDGE OF THE EXTENSION MUST CONTACT THE COLUMN (S101) AND THE OTHER SIDE TO THE BAR (K100). 1- FOR S101: SHOULD THE PRESENTATION THIS COLUM BE CARRYING THE CONCRETE FLOOR BE MARKED ON THE COLUMN STATIC/ REINFORCED CONCRETE TAB? 2- FOR K100: SHOULD BE MARKED THIS BEAM HAS CONCRETE FLOOR IN THE STATIC/ REINFORCED CONCRETE TAB? I WOULD LOVE TO ANSWER THE QUESTIONS WITHOUT SKIP.