Friends, take it easy everyone. Friends, there is radia foundation in my project. But I need to lower the level of the elevator curtains. I tear the radio tile with the tile gap command and lower the elevator curtain. But when I drew a separate radio upholstery again under the elevator curtains. The foundation works differently and the radio under the curtains does not save. As a solution to this, I need to surround the torn well foundation around the elevator curtains. If this is the way of solution, I would appreciate it if you briefly explain how to apply the well foundation.
 
It is necessary to model a vertical building element around the lift pit on a raft basis. This can be a vertical raft plate, or a continuous foundation beam without ammunition. As the program allows, you can get the desired result by entering a continuous foundation with a height of 150-160 cm and modeling a low raft slab at the elevation of the elevator pit. G.KOSE
 
"M.atalay":3rxf2j6t" said:
Friends, take it easy to all. Friends, my project has radia foundation. But I need to lower the level of the elevator curtains. I tear the radio floor with the floor space command and lower the elevator curtain down. But I can't lay a separate radio under the elevator curtains again. When I draw. The foundation works differently and the radio under the curtains does not save the floor. As a solution, I need to surround the torn well foundation around the elevator curtains. If the solution is like this, I would appreciate it if you briefly explain how to apply the well foundation.
About the foundation recipe under the elevator shaft You can find the information at the link below:
You do not have permission to view link Log in or register now.
Good work
 
Can you inform me that the number of steps in the well foundation is my basement coefficient, is the well foundation level height is the floor height, and what should be the minimum well foundation step width?
 