We're constantly having this problem with foundations

ncainsaat

New Member
First of all, take it easy, I have the following problem in foundations, when I lay foundations from certain angles, is there a solution to this?
You do not have permission to view link Log in or register now.
You do not have permission to view link Log in or register now.
as you can see, the tk6 foundation beam gets longer where it needs to be cut in the column, it is possible to fix this manually, but that's probably why too much iron comes out. It also gets longer, I tried every method including the object trim method, but I couldn't get out of it.
 
"ncainsaat":1x37zcqh" said:
First of all, it's easy, I have the following problem in continuous foundations, when I lay foundations at certain angles, is there a solution to this? As you can see, the tk6 foundation beam extends where it needs to be cut in the column, it is possible to fix it manually, but it is most likely this is why too much iron comes out, it also lengthens l, I tried every method including the object trim method, but I couldn't get it out
The situation you mentioned occurs because the continuous foundations connected from another direction are taken into account in the continuous foundation expansions.The angle difference between the continuous foundations is less than 30 degrees (Reinforced Concrete/Parameters/General Reinforced Concrete Parameters dialog "Continue accept beams with small angle difference" line.)
You do not have permission to view link Log in or register now.
Good work
 
Back