First of all, I wish you a good evening and good work... For a basement+ground+14-floor project, the basic values are not clearer but the foundation was not designed because the ground safety stress in a Z2 region was not clear yet, so I took Z3 for this project, but in my research I made a solution in izmir istanbul In big cities such as high-rise building regulations, and in embric methods, 0.01 of the surface area is curtain or 0.002 of the construction area (SCREEN RATIO CONTROL-idecadSTATİK, this reporting is available) I ask you for your criticisms and suggestions - should I do a curtain control at the rate of 0.002 (and something here? I noticed that when I throw the project upright in order to throw the axles less, the x and y direction areas are different when I make it horizontal at a 45 degree angle) Naturally, the effects are different because the x and y directions are different, but I am strange, have you had such an incident or do you have the 0.002 ratio check in your projects - accessories (my own opinion) I was tired, so I made 12 in the middle area and the choice was made to be 14, do you think it should be enlarged a bit, that is, is it reasonable to come 18 and 16 from the lower floors and drop them on the upper floors? -There is a curtain in the middle, in the symmetrical part of 45 degrees, and there are hollow balconies on the sides, do you think these should be normal flooring? My opinion is that I am thinking of making changes in the architecture of normal flooring. --As I said at the beginning, I'm waiting for ideas, suggestions and criticism, let those who want to write, don't let the friends who will behave like do not tire their hands... I am just trying to do the right thing and if I am missing, thank you to my friends who are interested in order to make up for it... good work
You do not have permission to view link
Log in or register now.
-