You do not have permission to view link
Log in or register now.
IM_BOZDEMİR_STATİK19_11-13_10.ide10.htmlHello, For the load combinations defined in the project you added, the line "Use for soil stress control" is unchecked. When this line is checked, you will be informed that the control has been made in the Loads and Combinations report. Also, a horizontal load is not defined for the H load in your project."ferdi25":39y7ohyi" said:I UPLOADED 1.6G+1.6Q+1.6H FOR BASIS AND 0.9G+1.6H FOR SCREEN BUT IT DOESN'T APPEAR IN THE REPORT