The system is pitched but appears as a frame in the y direction

Re: THE SYSTEM IS CURTAIN BUT NOT VISIBLE IN THE Y DIRECTION Hello. This formwork plan is in the basement, I think the other Y-direction may be framed in the superstructure. If you add your project, we can give a more accurate answer. Unver ÖZCAN
 
"hydrkrmn":4nviiqki" said:
OUR PROJECT IS CURTAIN BUT SEES AS FRAME IN THE DIRECTION OF THE PROGRAM WHAT IS THE REASON?
There is no curtain in the Y direction in your project. Therefore, the y direction appears as a frame.
"hydrkrmn":4nvii " said:
ALSO DO I HAVE THE OPPORTUNITY TO SOLVE THE PROJECT IN A MIXED SYSTEM
In order to solve a mixed ductility level system, there must be curtains in both directions and the shear force ratio on the curtains must be above 0.40. (TDY 2007 item 2.5.4)
 
As Ünver said, you don't have any curtains in the y direction in normal snow. Being mixed, you have to put curtains in both directions and the amount of it will force you this time. You will probably experience the shear force problem of the curtains.
 
I wrote it with the thought that there was no response when my screen was on. Before me, Mr. Levent gave the necessary and detailed answer.
 
I WANT TO ASK YOU ONE MORE THINGS I DO NOT KNOW BY THE EXCESS OF COLUMNS IN THE CONSTRUCTION, THE AMOUNT OF REINFORCEMENTS LOOKS TOO LITTLE TO ME IS THERE SOMETHING I'M DOING WRONG? THANK YOU FROM NOW.
 