The carrier system selection has taken A33, does it not need to take A24?

insmuhturker

New Member
First of all, hello, everything seems to be intertwined in this transition period. In a project we examined, one of the DTS:3 BYS 7 floors is plated and the other floors are hollowed out and the elevator curtain continues throughout the height of the building. The designer took the carrier system selection A33, SHOULD YOU TAKE A24 OR THE ELEVATOR CURTAINS TO THE COLUMN? THANK YOU FOR YOUR HELP.
 
Hello there; A33 can be selected for DTS3 and BYS7, but the curtains in the system must meet the Total Mdev>=0.75Mo condition in YBDY2018 Article 4.3.4.6. If not, A31 can be selected and continued. In case there is no curtain in the system, A31 can be selected directly for DTS3. If A24 is selected, it must still meet the condition in Article 4.3.4.6. Best regards.
 
Back
Top