Stapling error in hollow floor slab

Samet Karataş

New Member
Friends, good luck to all. I could not overcome the stapling error problem, no matter what I did in the project that will be basement+2K in the appendix that I have drawn. I did not get such errors when I did a similar project with a beamed floor application. Could the problem be caused by the flooring type? I ask for your comments and help.
You do not have permission to view link Log in or register now.
 
"Samet Karataş":zqfmbp8c" said:
Friends, good oil lamps to all. Whatever I did in the project that will be Bodrum+2K in the attached project, I couldn't get over the stapling error problem. I did not get such errors when I made the project with the beamed floor application. Could the problem be caused by the flooring type? I request your comments and help.
You do not have permission to view link Log in or register now.
Hello, You can check the link below for possible solutions to the Stapling problem:
You do not have permission to view link Log in or register now.
Note: In the project, the flooring type is unidirectional gear flooring. The flooring type is incorrectly selected in the TBDY wizard. In TBDY 2018, it is desired to provide mixed system conditions in single-direction gear flooring systems in buildings with Earthquake design class DTS=2. There are no perimeter curtains in your basement. It would be appropriate not to accept rigid rigid. Good work
 
Back
Top