U umutozalit New Member Feb 14, 2012 #1 In beamless raft flooring, for example, when a gap is required for 60/60 manholes, torn reinforcements are not placed for the gap.
In beamless raft flooring, for example, when a gap is required for 60/60 manholes, torn reinforcements are not placed for the gap.
Y YasinTezel Member Feb 14, 2012 #2 "umutozalit":2o78b3qg" said: In non-beamed raft slabs, for example, when it is necessary to open a 60/60 manhole, torn reinforcements are not placed for the gap. Click to expand... Hi, an application can be made as in the attached project by arranging the axes of the calculation. an appropriate equipment design will be made
"umutozalit":2o78b3qg" said: In non-beamed raft slabs, for example, when it is necessary to open a 60/60 manhole, torn reinforcements are not placed for the gap. Click to expand... Hi, an application can be made as in the attached project by arranging the axes of the calculation. an appropriate equipment design will be made