Some of my floors have deflection and lack of thickness

ÇağrıCE

New Member
In my project, the slabs at the level of the basement d172 slab (floors in front of the elevator) the system says to be 20 cm, I do not want to lay 20 cm. There are deflection and thickness deficiencies in some of my floorings. If there is a drawing error or a wrongly marked place, can you help me? I need to complete the project. Thanks in advance.
You do not have permission to view link Log in or register now.
I can add the architectural project. No elevator tower has been added.
 
Re: Slab problem in my project, etc.. Hello, 20 cm thickness is not required for D172 slab on the 1st basement floor ceiling. You can see it from the slab thickness control report. If you mean the D89 floor with the name on the ground floor, the reinforcement type console of the reinforcement axis no. 2 appears on this floor. In this case, the thickness control is made according to the console flooring criteria. All four sides of the floor are surrounded by beams. You can select the reinforcement type "Flat+pile" with the Edit command of Reinforced Concrete Calculation Axis in the slab assist toolbar. In this case, the thickness control criteria are made according to the slab running in both directions. Good work
 
Back
Top