How many rafts you have defined in the raft foundation general report, the number of raft foundation pressures will be printed from here. Add your project and let's see Ünver ÖZCAN"erkansucin":29kdgtsh" said:How can we control the foundation pressure stresses when there are two different rafts in the basement. For example, I cannot see the stresses in the elevator pit separately.
Mr. Ünver, only the pressure values of 1.4G+1.6Q and G+Q+E combinations are seen in the report, but the required minimum for G+Q, 1.4G+1.6Q and G+Q+E , cover. and max. pressure values, is there no way to learn these values more easily? In addition, a base pressure of the G+Q combination does not appear in the report."unver":2ogcf0rx" said:HiIf you define how many rafts in the raft foundation general report, the same number of raft foundation pressures are printed. You can check it out here. Add your project. Ünver ÖZCAN"erkansucin":2ogcf0rx" said:How can we control the basic compressive stresses when there are two different rafts in the basement. For example, I cannot see the stresses in the elevator pit separately.
"unver":2n6uq7x1" said:Hi Click on the preliminary design results icon for the Reports-Geotechnical report.